top of page
Raymond Central Public Schools
Pre-School/Classroom Addition
The project consisted of a one (1) story in height addition and has a total area of approximately 5,500 square feet. Construction included masonry walls with brick veneer and metal exterior panels. Roof structure is a steel joists and deck, with a metal roof panel system to match existing. The HVAC work included expanding the existing water loop supply/return for the new Heat Pump and ERV.
1/8
-
Client: Raymond Central Public Schools
-
Location: Raymond, NE
-
Project Status: Completed
-
Project Type: School
-
Sq. Footage: 5,500
bottom of page